5 new child friendly water points construction ompleted
5 Re-construction of existing water points for adults completed
Connection of 3 new hand wash trough completed
Construction of 5 new dry pit latrine completed
Construction of 10 menstrual health management (MHM) classes fully completed
onstruction one water tank with the capacity of m3 has been completed
One gravity feed water sypply system
One spring capping completed
Four water points constructed
One water tank constructed
One WASH Com Estabilished
Construction of one gravity feed water supply system
Construction of 2 spring capping
Construction of 2 water points
Construction of 1 water tank
Esatbilishement of 1 WASH Com with 7 members
One spring capping completed
construction of two water tanks with the capacity of 5 and 25 m3
Six water points fully functional
One WASH Com with 7 members
Four water points have been constructed
6.5 km pipe line installation complted
1 spring capping fully completed
5m3 water tank for school constructed
6 water points fully completed
Construction of two primary schools with four classes each
Construction of two single O class each
Construction two toilets with four comartment each
5m3 water tank constructed
1 spring capping fully completed
2 water tap completed
1 WASH Com with 7 memberd estabilished
Three manual water wells drilled
Estabilishemnet and train WASH Com
Conduct feasibility study
Supply of 1000 litre capacity rorto water tank
Installing of drip irrigation system to irrigate 200 m2.
Hand over the completed pilot drip irrigation project to Imagine 1 day
- One Reservoir with capacity of 25m2,
- Two water points,
- 1.6 Km of water pipeline installed and
- Washco training given and established
- on spot spring capping installed
- 1 water tap attached on the collection box
- 1 Collection box
- 2 caretakers trained
- 7 Washco established
The main components of this project were includes:
A. Three manual water well drilling with fitted appropriate hand pump.
B. Establishing and train WASH committee.
C. Conducting further feasibility study.
- One ferro cement water tank with capacity of 25m2,
- Two water points installed
- 1.3km pipeline was fixed
- 3 water points installed,
- 2 water tap placed at mosque,
- 3km of pipeline to the village installed,
- 7 WaSHco established
- 1 spring capping
- 3 water points installed,
- 1.86 km of pipeline to the village installed,
- 7 WaSHco established